Money Cube Plus

  • Subscribe to our RSS feed.
  • Twitter
  • StumbleUpon
  • Reddit
  • Facebook
  • Digg

Saturday, 28 August 2010

"A Break From Knives"

Posted on 06:27 by Unknown
Hi all,
1st. let me thank everyone for their patience on my "Knife" project.
Things are moving forward.
Also, I had to start an "Interest" list as the response has been overwhelming.
I currently have 3 times more names on the list than I'll have knives available, and have closed the list.
With that said I'm taking a break from the kinves today, and starting a run of my "Ti Lights". (scroll down the page if you're unaware of what they are.)
As soon as they are finished up, and the "SLGV's" arrive I'll be posting them for sale.
Stay tuned, and as always thanks for playing along.
Kenn
Read More
Posted in | No comments

Saturday, 14 August 2010

"Quick Update"

Posted on 14:35 by Unknown
Hey Kids,
This is just a quickie update.
I'm at the shop as I'm typing this, running out the "Blade Grind" operation.
Hopefully I can get them off to the Heat Treaters this week.
So I'm getting ever closer to the end of this Knife project.
Thanks for stopping by, Kenn
Read More
Posted in | No comments

Wednesday, 4 August 2010

"The Blades Are In Process"

Posted on 10:07 by Unknown
Hi Folks,
Here's what was accomplished between Saturday, and yestarday.
The 1st. opp. was to mill 1/2 of the profile. (Saturday)
After a quick fixture adjustment the 2nd. opp was completed. (yesterday)
I'm at the shop now adding the rough blade grinds to both sides of the blades.



 
 
 
 
And here are the pics of todays mission.
The 1st. one shows the profiled blade in the fixture I made to add the grinds. To add the grinds to the opposite side I flip the blade to the left, and turn on the mirror image function in the machining center control for the "X" axis.
The 2nd. photo shows a blade all roughed out.
I hope you're enjoying the WIP on these,

Read More
Posted in | No comments
Newer Posts Older Posts Home
Subscribe to: Posts (Atom)

Popular Posts

  • "Encapsulator XL"
      Here is a large version of the "Encapsulator". Physical dimensions are 1.00" O.D. X 3.625" long, .600"  I.D. X  2...
  • "JMA Progress Report"
    Hello all, Well this weekend is shot. I have both of the Machining Centers at the shop full up with  " real"  jobs, so no JMA pro...
  • "The Butcherette"
    Hey there all, I had some time at the shop today while one of the Machining Centers was cycling, so I decided to try my hand at a Necker ty...
  • "Pocket Level SUS"
    **This sale has run it's course, with the winners announced below**   Hello folks, Up for a Sign Up Sale this evening I have 16 "P...
  • "V2 Ti Drive"
    Well hello again, This evening I have a few "Version 2 Ti Drives" available. The last time I made my original "Ti Drives...
  • "So What's Going On?"
    Hello there folks, I've been battening down around the house for the impending Winter months. Had to stack 4 cord of wood in the basemen...
  • "Sign Up Sale With A Twist....""
    !!!This SUS has run it's course, and the winners have been announced below!!! Hello everyone, So I have these "Prototype Cam Beads...
  • "Ti Lights, and other info"
    Good evening folks, Info first, I'll be working on a small run of Tellurium Hextuple Cubes tomorrow. I'm hoping to have them ready f...
  • "Knife Lock Bar Stabalizer System"
    Here we go folks, finally some new knife pictures. I came to the realization that I needed to add a stabalizer of some sort to the knives. H...
  • "Danged Weather"
    Hello, Well being New England we're having some Winter weather here. Due to this my Satellite Internet is being very spotty, with little...

Blog Archive

  • ►  2014 (1)
    • ►  January (1)
  • ►  2013 (41)
    • ►  December (6)
    • ►  November (2)
    • ►  October (7)
    • ►  September (6)
    • ►  August (4)
    • ►  July (2)
    • ►  June (2)
    • ►  May (3)
    • ►  April (3)
    • ►  March (2)
    • ►  February (3)
    • ►  January (1)
  • ►  2012 (65)
    • ►  December (5)
    • ►  November (6)
    • ►  October (3)
    • ►  September (6)
    • ►  August (6)
    • ►  July (7)
    • ►  June (2)
    • ►  May (6)
    • ►  April (3)
    • ►  March (7)
    • ►  February (4)
    • ►  January (10)
  • ►  2011 (55)
    • ►  December (11)
    • ►  November (8)
    • ►  October (4)
    • ►  September (4)
    • ►  August (1)
    • ►  July (2)
    • ►  June (4)
    • ►  May (4)
    • ►  April (4)
    • ►  March (3)
    • ►  February (2)
    • ►  January (8)
  • ▼  2010 (41)
    • ►  December (3)
    • ►  November (7)
    • ►  October (4)
    • ►  September (3)
    • ▼  August (3)
      • "A Break From Knives"
      • "Quick Update"
      • "The Blades Are In Process"
    • ►  July (4)
    • ►  June (4)
    • ►  May (7)
    • ►  March (3)
    • ►  February (1)
    • ►  January (2)
  • ►  2009 (17)
    • ►  December (2)
    • ►  November (1)
    • ►  October (1)
    • ►  July (1)
    • ►  May (2)
    • ►  April (3)
    • ►  March (7)
Powered by Blogger.

About Me

Unknown
View my complete profile