Hi Folks,
Here's what was accomplished between Saturday, and yestarday.
The 1st. opp. was to mill 1/2 of the profile. (Saturday)
After a quick fixture adjustment the 2nd. opp was completed. (yesterday)
I'm at the shop now adding the rough blade grinds to both sides of the blades.
And here are the pics of todays mission.
The 1st. one shows the profiled blade in the fixture I made to add the grinds. To add the grinds to the opposite side I flip the blade to the left, and turn on the mirror image function in the machining center control for the "X" axis.
The 2nd. photo shows a blade all roughed out.
I hope you're enjoying the WIP on these,
Wednesday, 4 August 2010
Subscribe to:
Post Comments (Atom)
0 comments:
Post a Comment